| 1. | Early operation of acute cervical spinal cord injury 急性颈脊髓损伤的早期手术疗效 |
| 2. | Early operations included meteorological and magnetic observations , a time service based on astronomical observations and a tropical cyclone warning service 早期的工作包括气象及地磁观测根据天文观测报导时间和发出热带气旋警告等。 |
| 3. | Early operations included meteorological and magnetic observations , a time service based on astronomical observations and a tropical cyclone warning service 早期的工作包括气象及地磁观测、根据天文观测报导时间和发出热带气旋警告等。 |
| 4. | Conclusions it is effective to treat complicated ocular trauma with intraocular foreign bodies in case of children by vitrectomy , especially early operation after trauma 结论儿童复杂性眼外伤伴眼内异物的治疗采用玻璃体切除术是可行的,宜及早手术。 |
| 5. | The environmental problems in early operation period of taolinkou reservoir are analyzed and the future impact is discussed in the article 大型水利枢纽工程对环境的影响一直受到社会的关注,本文对桃林口水库运行初期环境影响问题进行了分析和对未来影响进行了探讨。 |
| 6. | Positive exploration and innovation that has formed by the limited ascending project financing without state assurance in the first time have been expound mainly in this paper . this paper has analyzed the positive effect of this financing mode on the cost of the project and advanced performance of equipment , index of technology and economy , and safety , economy and credibility of operation during the earlier operation 该文分析了这种目前属于国际惯例的融资方式对工程造价的影响,分析了先进的设备性能对试生产期技术经济指标和电厂安全、经济、可靠运行产生的积极影响,分析了电厂技改项目对进一步提高经济效益,创建一流的电厂运行水平产生的影响。 |
| 7. | The key to the time control of newly - built projects is to fix project ' s general control task time and stage control task tine , and break them up to the time plan to realize the project ' s early operation and benefit achievement ; the time control should aim at practicing the plan but not affecting the project ' s annual irrigation plan , by working out plan , following up the construction and timely error correcting management to make sure the achievement of project ' s task time 新建项目的施工进度控制的关键是要合理地确定项目总控制工期和阶段性控制工期,并将其分解落实到进度计划中,以实现工程及早投运、及早发挥效益的目标;更新改造项目的进度控制则要以进度计划的落实不影响工程的年度灌溉计划为目标,采取合理制定计划、跟踪施工、及时纠编的管理办法,确保项目工期目标的实现 |